Related Control Systems
Certain elements, critical to COP in the type approval context, are not necessarily covered by the control plan as defined above.
- control of change, so that for example, alternative suppliers or revised specifications are not introduced before the type approval of the change has been authorised.
- control of the accuracy issue of Certificates of Conformity, so that details are pertinent accurate for the vehicle variant produced and the certification issued.