Guide to Control Plans
This page was last updated on 21st June 2022
Contents
- Guide to Control Plans Overview
- Relationship to Quality Certification
- When are Control Plans Required?
- What are Control Plans?
- Preparation of Plans
- Related Control Systems
- Acceptance
- Monitoring Activities
- Appendix 1 - Some Helpful Headings for General Information
- Appendix 2 - Example of a Control Plan
- Appendix 3 - An Example of a Control Plan for Whole Vehicle (In Addition to Individual System Plans)
Appendix 2 – Example of a Control Plan
Subject | CoP Requirements | |||
Regulation | Inspection Type | Frequency | Control | |
Noise
|
51 | 1 | 1 per year | IVXX1 |
2 | 1 per month | |||
Emissions | 83 | 1 | 1 per month | IVXX2 |
2 | 1 per month | |||
4 | 100% | |||
Audible Warning | 28 | 1 | 1 per Year | IVXX3 |
2 | 1 per month | |||
4 | 100% | |||
Seat Strength | 17 | 2 | 1 per month | IVXX4 |
3 | 100% | |||
4 | 100% | |||
5 | 100% | |||
Speedometer | 39 | 1 | 1 per year | IVXX5 |
2 | 1 per month | |||
4 | 100% |
Key | |
1 | Vehicle Test |
2 | Visual Inspection |
3 | Record on build log |
4 | Function check |
5 | Supplier CoP |
Type of Inspection | Description | Procedure | Responsibility | Record |
1 | Drive by noise | IV-1.2.3 | Quality | Test Report |
2 | Exhaust/Air cleaner/ECU ID | IV-1.2.3 | Quality | Monthly CoP audit sheet |
Control Description Sheet – IVXX4 Seat Strength | ||||
Type of Inspection | Description | Procedure | Responsibility | Record |
2 | ID/Installation | IV-2.3.4 | Quality | Monthly CoP audit sheet |
3 | Seat Function | IV-2.3.5 | Production | Build log |
3 | Seat Anchorage | IV-2.3.5 | Production | Build log |
5 | Seat Test | IV-3.4.5 | Supplier | Test Report |